Gallery

Our Work

Show days with our buyers, progress on the ground at Summer Greens, and the builds and spaces we’ve delivered across Zimbabwe.

Bush clearing with an excavator Infrastructure Road subgrade compaction Infrastructure Concrete culvert pipes ready for laying Infrastructure Culvert pipes delivered to site Infrastructure Crew laying culvert pipes Infrastructure Laying a road crossing culvert Infrastructure Preparing a culvert gap for concrete filling Infrastructure Concrete works on an access culvert Infrastructure A finished access culvert slab Infrastructure Painting culvert headwalls Infrastructure A painted culvert headwall Infrastructure Storm drain set out for concrete lining Infrastructure Crew connecting a water main Infrastructure Concrete lining a storm drain Infrastructure Crew placing concrete drain lining Infrastructure Plastering a lined storm drain Infrastructure Plastering the drain floors Infrastructure Drain floors plastered and finished Infrastructure New kerbing Infrastructure Plastering the gaps along a drain Infrastructure A plastered storm drain Infrastructure Plastering a curved storm water drain floor Infrastructure Storm water drain floor at a bend Infrastructure Offloading culvert pipes Infrastructure Backfilling behind new kerbstones Infrastructure Bedding and laying the water main Infrastructure Water pipe laid in an open trench Infrastructure Water reticulation pipe laying in progress Infrastructure A water main and valve in the trench Infrastructure Delivering VG couplings and gate valves to site Infrastructure Mobilising materials for the gate valves Infrastructure A gate valve installed on the water main Infrastructure A VG coupling on the water main Infrastructure A roller compacting earthworks Infrastructure Valve chamber going in on the water main Infrastructure Casting a thrust block at a pipe junction Infrastructure A finished thrust block Infrastructure Pressure testing the water main Infrastructure Manholes going in Infrastructure The pressure gauge during the water main test Infrastructure Sewer reticulation pipe laying Infrastructure Laying 200mm sewer pipe Infrastructure Loading quarry dust for the roads Infrastructure Mobilising plant for road precoating Infrastructure Loaders and crew on site Infrastructure Precoated chips on site ahead of tarring Infrastructure