Gallery

Our Work

Show days with our buyers, progress on the ground at Summer Greens, and the builds and spaces we’ve delivered across Zimbabwe.

Aerial view of the Summer Greens road layout Summer Greens Two visitors on a Summer Greens show day Show Days Presenting Summer Greens to buyers under the Project 529 tent Show Days Surveyors taking levels on site Summer Greens A visitor celebrating on site at Summer Greens Show Days Road crew working alongside a roller and grader Summer Greens Buyers gathered at the Project 529 tents Show Days Aerial view of Summer Greens Summer Greens A family visiting the site with a member of our team Show Days A Project 529 backhoe loader at work Summer Greens Roof trusses going up Construction & Fit-Out Taking buyers through Summer Greens Show Days A grader shaping a new road Summer Greens Aluminium and glass partition fit-out Construction & Fit-Out Buyers and our team on a sunset site tour Show Days Crew connecting a water main Infrastructure A Project 529 roller on site Summer Greens Our team and visitors walking the estate roads Show Days Crew fixing roof timbers Construction & Fit-Out Concrete culvert pipes on site Summer Greens Buyers listening during a site briefing Show Days Roadworks at Summer Greens Summer Greens New kerbing Infrastructure Members of the Project 529 team on show day Show Days A new road bed with the graders beyond Summer Greens Reinforcing steel and plumbing in a slab Construction & Fit-Out Buyers at the Project 529 briefing table Show Days Aerial view of the Summer Greens stands Summer Greens Loading culvert pipes Infrastructure Visitors at the Project 529 tents Show Days The Summer Greens banner beside a new road Summer Greens Renovation brickwork Construction & Fit-Out Talking through the plans at sunset Show Days A water main and valve in the trench Infrastructure A manhole beside a newly formed road Summer Greens Glass office partitions Construction & Fit-Out The Summer Greens tent on show day Show Days A grader and crew on site Summer Greens A roller compacting earthworks Infrastructure Buyers arriving for a site tour Show Days Reinforcing mesh laid for a slab Construction & Fit-Out Concrete pipes stacked beside the site water tank Summer Greens Formwork and props for a suspended slab Construction & Fit-Out Buyers gathered on site during a tour Show Days Manholes going in Infrastructure A water bowser on the new roads Summer Greens Solar inverter and distribution board installation Construction & Fit-Out Buyers following a site briefing Show Days Renovation paving Construction & Fit-Out Loaders and crew on site Infrastructure Site crew on the earthworks Summer Greens Reinforcing steel for a ground beam Construction & Fit-Out