Gallery

Our Work

Show days with our buyers, progress on the ground at Summer Greens, and the builds and spaces we’ve delivered across Zimbabwe.

Aerial view of the Summer Greens road layout Summer Greens Bush clearing with an excavator Infrastructure Two visitors on a Summer Greens show day Show Days Road subgrade compaction Infrastructure Presenting Summer Greens to buyers under the Project 529 tent Show Days Concrete culvert pipes ready for laying Infrastructure Surveyors taking levels on site Summer Greens Foundation footings for a new building Construction & Fit-Out A visitor celebrating on site at Summer Greens Show Days Culvert pipes delivered to site Infrastructure Road crew working alongside a roller and grader Summer Greens Crew laying culvert pipes Infrastructure Buyers gathered at the Project 529 tents Show Days Laying a road crossing culvert Infrastructure Aerial view of Summer Greens Summer Greens Foundation brickwork going in Construction & Fit-Out A family visiting the site with a member of our team Show Days Preparing a culvert gap for concrete filling Infrastructure A Project 529 backhoe loader at work Summer Greens Concrete works on an access culvert Infrastructure Roof trusses going up Construction & Fit-Out A finished access culvert slab Infrastructure Taking buyers through Summer Greens Show Days Foundation walls set out for a new block Construction & Fit-Out A grader shaping a new road Summer Greens Painting culvert headwalls Infrastructure Aluminium and glass partition fit-out Construction & Fit-Out A painted culvert headwall Infrastructure Buyers and our team on a sunset site tour Show Days Storm drain set out for concrete lining Infrastructure Crew connecting a water main Infrastructure Foundation walls with backfill in progress Construction & Fit-Out A Project 529 roller on site Summer Greens Concrete lining a storm drain Infrastructure Our team and visitors walking the estate roads Show Days Crew placing concrete drain lining Infrastructure Crew fixing roof timbers Construction & Fit-Out Plastering a lined storm drain Infrastructure Concrete culvert pipes on site Summer Greens A freshly cast floor slab Construction & Fit-Out Buyers listening during a site briefing Show Days Plastering the drain floors Infrastructure Roadworks at Summer Greens Summer Greens Drain floors plastered and finished Infrastructure New kerbing Infrastructure Plastering the gaps along a drain Infrastructure Members of the Project 529 team on show day Show Days Brickwork and roof structure on a new build Construction & Fit-Out A new road bed with the graders beyond Summer Greens A plastered storm drain Infrastructure Reinforcing steel and plumbing in a slab Construction & Fit-Out Plastering a curved storm water drain floor Infrastructure Buyers at the Project 529 briefing table Show Days Storm water drain floor at a bend Infrastructure Aerial view of the Summer Greens stands Summer Greens A new build at roof level Construction & Fit-Out Offloading culvert pipes Infrastructure Backfilling behind new kerbstones Infrastructure Visitors at the Project 529 tents Show Days Bedding and laying the water main Infrastructure The Summer Greens banner beside a new road Summer Greens Water pipe laid in an open trench Infrastructure Renovation brickwork Construction & Fit-Out Interior brickwork and a door frame Construction & Fit-Out Talking through the plans at sunset Show Days Water reticulation pipe laying in progress Infrastructure A water main and valve in the trench Infrastructure Delivering VG couplings and gate valves to site Infrastructure A manhole beside a newly formed road Summer Greens Mobilising materials for the gate valves Infrastructure Glass office partitions Construction & Fit-Out Service chases cut into the brickwork Construction & Fit-Out The Summer Greens tent on show day Show Days A gate valve installed on the water main Infrastructure A grader and crew on site Summer Greens A VG coupling on the water main Infrastructure A roller compacting earthworks Infrastructure Valve chamber going in on the water main Infrastructure Buyers arriving for a site tour Show Days Interior brickwork and designated built-in cupboard (BIC) area Construction & Fit-Out Reinforcing mesh laid for a slab Construction & Fit-Out Casting a thrust block at a pipe junction Infrastructure Concrete pipes stacked beside the site water tank Summer Greens A finished thrust block Infrastructure Formwork and props for a suspended slab Construction & Fit-Out Pressure testing the water main Infrastructure Buyers gathered on site during a tour Show Days Roof trusses over the new rooms Construction & Fit-Out Manholes going in Infrastructure The pressure gauge during the water main test Infrastructure A water bowser on the new roads Summer Greens Sewer reticulation pipe laying Infrastructure Solar inverter and distribution board installation Construction & Fit-Out Laying 200mm sewer pipe Infrastructure Buyers following a site briefing Show Days Loading quarry dust for the roads Infrastructure Renovation paving Construction & Fit-Out Mobilising plant for road precoating Infrastructure Loaders and crew on site Infrastructure Precoated chips on site ahead of tarring Infrastructure Site crew on the earthworks Summer Greens Reinforcing steel for a ground beam Construction & Fit-Out